Network, planning and performance
Logistics network design under Brazil’s tax reform
We optimize the network and the tax burden in the same model and show, year by year to 2033, what to keep, what to change and when.
The decision
Which distribution centres still pay off under the tax reform?
What you receive
- Value of each ICMS incentive, year by year to 2033
- The year each incentive-driven DC stops paying for itself
- Transition plan aligned with the lease contracts
When the executive team calls us
- A DC located because of a state incentive
- A DC lease or investment maturing before 2033
- Accumulated ICMS credit with no identified cause
- A multi-year budget that does not yet reflect the reform
How to start
A 30-minute conversation with a consultant defines the scope and price of the first phase.
Discuss your network under the tax reformContext
In most of the networks we review in Brazil, logistics and tax decide separately. Supply chain chooses where to hold inventory on transport cost and service level. The tax team then tries to optimize an operation it received fully formed.
A location that is optimal from a logistics standpoint can be poor from a tax standpoint, and the reverse also happens. In Brazilian interstate chains, the difference in tax burden between two network configurations frequently exceeds, in absolute terms, the entire freight saving being pursued.
Our approach puts both dimensions in the same optimization model, with state tax rules represented as constraints and tax burden as a component of total cost. The model returns the best combination of network and tax structure.
Brazil’s consumption tax reform gives this work a deadline. Under Constitutional Amendment 132/2023 and Complementary Law 214/2025, taxation moves to destination. ICMS is stepped down between 2029 and 2032 while the new IBS rises, and ICMS is extinguished in 2033. A distribution centre that exists because of a state incentive loses its fiscal reason to exist, so we run the model year by year across the transition.
Scope of work
Tax burden map by flow
Effective fiscal cost reconstructed by invoicing route and by state, including rate differentials, tax substitution and accumulated credit.
Integrated logistics-tax model
Joint optimization of location, allocation and invoicing route, with state rules represented as model constraints.
Transition scenarios, 2026 to 2033
The optimal network simulated at each stage of the tax reform, showing in which year each incentive-driven facility stops paying for itself.
Regime and incentive assessment
Analysis of applicable special regimes and state incentive programmes, with net benefit and counterpart obligations quantified.
Accumulated credit diagnosis
Identification of structural credit build-up and of the network configurations that cause it, so that this financial cost is attributed to the decision behind it.
Transition plan
Migration sequencing with risk, operational effort and capture timeline assessed for each move.
Discuss my case
Signals your team will recognise
When three or more of these describe your operation, we usually find enough value to justify a diagnostic.
Discuss your network under the tax reform- A distribution centre located because of a state ICMS incentive.
- A network designed on logistics criteria without the tax team, or on tax criteria without logistics.
- A DC lease or investment that matures within the reform window.
- Structural ICMS credit build-up with no identified root cause.
- An import operation with the port and the customs clearance state still open.
- Effects of the tax reform on the network not yet mapped through 2033.
What we need from your company
- Map of DCs, invoicing flows and current incentives
- Lease contracts and investments made
- Involvement of the tax team, which validates the classification
Who leads
The founder of LogConsult leads the project from start to finish, takes part in the meetings with the executive team and answers for the result.
How we engage
Fixed fee per modelling phase plus success fee on net benefit captured
FAQ
Frequently asked questions
Does the tax reform force us to move our distribution centres?
It does not force a move, but it changes the calculation. With taxation at destination, the location of a distribution centre no longer reduces tax. A DC justified only by a state incentive becomes pure logistics cost when ICMS is extinguished in 2033. The model shows in which year of the transition leaving starts to pay off.
When is the right time to redesign the network?
Before 2029, when the gradual reduction of ICMS begins. A network decision takes two to three years between study, contract negotiation and physical change, so a study started in 2029 arrives late. Done now, it lets the exit follow lease expiries and the value the incentive still has.
Do current tax incentives still have value?
Yes, during the transition. ICMS is reduced in steps between 2029 and 2032 and ceases to exist in 2033. For onerous incentives granted until 31 May 2023, for a fixed term and subject to conditions, the reform provides a fund that compensates this reduction until 2032, subject to qualification. Other incentives lose value each year. We therefore run the analysis year by year and incentive by incentive, and the client's tax team validates the classification.
Do you replace the company’s tax advisers?
No. We work alongside the internal tax team and the client’s tax counsel, who validate classification and interpretation. Our contribution is the model that optimizes network and tax burden in a single step.
Is this aggressive tax planning?
No. We work with the real operating structure: where the goods are, how they move and which regime applies to that operation. We do not design structures whose sole purpose is fiscal.
Related practices
Logistics network optimization and service level
We model the network formally to answer where to produce, where to hold inventory, how to route and at what service level. The solution carries a mathematical guarantee of optimality, which a spreadsheet heuristic cannot give.
05S&OP and S&OE: integrated sales and operations planning
We implement the S&OP cycle and the S&OE routine so that sales, operations and finance decide on the same plan, with scenarios in numbers and named owners.
06Simulation and mathematical models for operating and investment decisions
We build a model of your operation and test decisions in it before the money is spent: how many berths, how many wagons, which inventory policy and what a queue does to the system.
Next step
Put a number on the recoverable value in your operation
The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.