Network, planning and performance

Simulation and mathematical models for operating and investment decisions

We build a model of the operation and test berths, wagons, yards and inventory policies in it, with the real variation of each day.

For whom
Terminals, railways, ports, manufacturers and investors with a capacity or investment decision to make
Typical timeline
6 to 12 weeks per model, depending on complexity

The decision

Will the capacity investment remove the bottleneck, and can we know before construction begins?

What you receive

  • Effective capacity of the current operation and the bottleneck that limits it
  • Investment scenarios compared on capacity and cost
  • Model handed over to the team for future decisions

When the executive team calls us

  • A capacity investment going to the board
  • Queues and congestion at the harvest or demand peak
  • Fleet or equipment contracted without formal sizing

How to start

A 30-minute conversation with a consultant defines the scope and price of the first phase.

Test an investment before construction

Context

A spreadsheet calculates averages. A real operation has queues, breakdowns, rain, late vessels and trucks that arrive all at once. Capacity is lost in that variation, which is why a terminal sized on the average stalls at peak.

Discrete-event simulation reproduces the operation event by event, with the variability measured in the client’s data. Mathematical optimization selects the best configuration among millions of combinations. We use the two separately or together, depending on the question.

The model is validated against history before it is used for decisions. Only then do we test the scenarios: one more berth or one more shift, own or contracted fleet, a new yard or a new service rule. The answer comes in capacity, cost and service level, with the uncertainty range stated.

Scope of work

01

Simulation model of the operation

A terminal, yard, line, fleet or complete chain reproduced in simulation software, with animation and validation against real data.

02

Capacity sizing

Number of berths, lines, hoppers, wagons, trucks or storage positions needed to handle the projected volume at the required service level.

03

Network, mix and schedule optimization

Mathematical programming models for location, flow allocation, sequencing and the scheduling of production or shipments.

04

Investment scenarios

Comparison of alternatives in works, equipment and operating rules, with the gain from each and the recommended order of execution.

05

Model handed over and team trained

The client receives the model, the documentation and the training to run new scenarios without depending on us.

Discuss my case

Signals your team will recognise

When three or more of these describe your operation, we usually find enough value to justify a diagnostic.

Test an investment before construction
  • A capacity investment about to be approved without scenario testing.
  • A recurring queue or delay whose cause has not been isolated.
  • A new terminal, yard or spur project that has to demonstrate its capacity to a lender.
  • A decision between own and contracted fleet, or between more shifts and more equipment.

What we need from your company

  • Time-stamped operating records for recent months
  • Facility layout and operating rules
  • A counterpart from engineering or operations

Who leads

The founder of LogConsult leads the project from start to finish, takes part in the meetings with the executive team and answers for the result.

How we engage

Fixed fee per model, with optional annual update

FAQ

Frequently asked questions

What is the difference between simulation and optimization?

Simulation shows what happens if a decision is taken, considering the variability of the operation. Optimization indicates which decision is best within the constraints. Sizing a terminal calls for simulation. Designing a network or scheduling shipments calls for optimization. In large projects, each feeds the other.

What data is needed?

Arrival and service records, operating times by step, stoppages and volumes by period. Part of the early work is to treat this data and measure the real variability of each step.

Does the client keep the model?

Yes. We deliver the file, the documentation and the training. The annual update is optional.

Does it work for a project that does not exist yet?

Yes. For new projects we use parameters from comparable operations and from the engineering design, and the model then supports the feasibility study and the discussion with the lender.

Next step

Put a number on the recoverable value in your operation

The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.

Talk to a consultant WhatsApp

Reply within one business day · [email protected]