LogConsult Academy · I3

Demurrage and Detention: Prevent and Recover

The money that sits idle at the port and in the queue, and how to recover it.

Lessons are recorded in Portuguese with Portuguese subtitles. Every lesson comes with its full text in English.

about US$ 370 · Prices in Brazilian reais (BRL), paid through Mercado Pago (Pix, credit card in up to 12 installments, or boleto). The checkout page is in Portuguese.

Ports and tradeFree lesson
I3 · Intermediate
Demurrage and Detention: Prevent and Recover

Program

5 video modules, 19 min, 5 exercises

  1. Laytime, demurrage, and dispatch: what the contract says
  2. Road and rail detention
  3. Prevention: windows, line-up, and scheduling
  4. Checking laytime with documentary proof
  5. Recovering amounts and closing a settlement

What you build

Demurrage calculator and checking checklist

Free sample: the first 2 minutes of module 1

Lesson text in English · 1

Laytime, demurrage, and dispatch: what the contract says

Laytime, demurrage, and dispatch. Hi, I'm Lia, the virtual presenter of LogConsult Academy. This is the first module of the course on Detention and Demurrage. In a few minutes, you will understand the three terms that define how much an idle ship costs: laytime, demurrage, and dispatch. And you will leave knowing how to read the contract clause that decides who pays that bill.

Why this matters. Every day a ship sits at port beyond what was agreed generates a cost. The important point is that who pays this cost does not depend on who seems to be at fault. It depends on what is written in the contract. And the invoice usually arrives weeks after the operation, when the memory of what happened has already faded. That is why whoever understands the contract checks the bill. Whoever does not understand it just pays.

The charter party. Everything starts with the charter party. On one side is the shipowner, who is the owner or operator of the vessel. On the other, the charterer, who hires the vessel to carry the cargo. In voyage charters, this is the document that sets the rules for loading and unloading time, and the price of each extra day.

Laytime: the free time. The first term is laytime. It is the time the contract grants to load or unload the ship without extra charge. It can be written in several ways: in running hours, in working days, or as an operating rate. For example, ten thousand tons per day. In that case, a ship with sixty thousand tons would have six days of laytime.

Which days count. Next comes the question: which days are included in the count? Contracts use English abbreviations for this. One of them indicates that Sundays and holidays count normally. Another indicates that they are left out. There is also the weather working days rule, in which only the days when the weather allows work count. Two identical operations can have very different costs just because of this line in the contract.

When the clock starts. Laytime does not start when the ship appears on the horizon. Normally, three conditions must be met. The ship has arrived at the place stated in the contract. The ship is ready to begin operations. And the master has delivered the notice of readiness. After the notice, many contracts still give a grace period before the clock starts. A notice delivered outside the rules may not be valid, and that changes the whole calculation.

What interrupts the count. Even after it starts, the clock can stop. Contracts list exceptions, such as rain during grain loading, strikes covered by the clause, or failures of the ship itself. During those periods, the time is not deducted from laytime. In the check, the exceptions are where errors show up most. An hour of rain forgotten in the calculation turns into money overpaid.

Demurrage: the cost of delay. When the time used goes beyond laytime, the second term comes in: demurrage. It is compensation to the shipowner for each day of delay, at a value set in the contract, usually in dollars per day. The charge is usually prorated by the hour. If the ship went half a day beyond the deadline, half a day of demurrage is paid.

A calculation example. Let's go through an example with illustrative numbers. The contract gives seventy-two hours of laytime. After deducting the exceptions, the operation used ninety hours. The excess is eighteen hours, or three quarters of a day. With a rate of twenty thousand dollars per day, demurrage is fifteen thousand dollars. Notice how each hour deducted changes the final amount of the bill. That is why checking is worth it.

Once on demurrage.... There is a rule very often cited in the industry: once on demurrage, always on demurrage. It means that after laytime ends, the exceptions normally stop interrupting the count. The rain that used to stop the clock no longer stops it. Unless the contract says otherwise. It is worth reading this part carefully.

Dispatch: the reward for speed. The third term is dispatch, the reverse path. If the operation finishes before the end of laytime, the contract may provide for a reward paid by the shipowner for the speed. Often, this amount is set at half of the demurrage rate. But note: not every contract has dispatch. Check the clause before counting on this money.

Module exercise. To close, an exercise. Take a charter party from your operation. Mark five points: the laytime form, the day-counting rule, the commencement conditions, the exceptions, and the demurrage and dispatch rates. In the next module, we will use this contract to build the timeline of an operation, hour by hour, and check a real invoice. See you there.