Infrastructure, investment and expansion

Market studies and cargo movement potential

We measure the existing cargo, the cost-based catchment area and the share the asset wins in each scenario.

For whom
Investors, operators, port authorities and governments
Typical timeline
8 to 16 weeks

The decision

How much cargo can the asset capture, and from whom?

What you receive

  • Current and projected demand by origin, destination and product
  • Volume the asset can capture in each scenario
  • Sensitivity to the assumptions that move the result most

When the executive team calls us

  • A decision to invest in a terminal, rail spur or port
  • A project seeking financing or a partner
  • A business plan with a demand figure nobody has reviewed

How to start

A 30-minute conversation with a consultant defines the scope and price of the first phase.

Discuss demand for your project

Context

Every logistics infrastructure project rests on a demand estimate. In our experience, projects go wrong in that estimate far more often than in engineering or in the financial model.

The macro projection (crop growth, sector GDP and trade volumes) is rarely the source of the error. The common error is in capture. The study assumes that a well-located asset will attract a share of the cargo in its catchment area and does not demonstrate why a shipper would change route. Cargo migrates on total cost, available capacity and reliability, never on proximity alone, and only when the difference exceeds the friction of switching.

Our studies start from real cargo: an origin-destination matrix rebuilt from public and field data, a catchment area delimited by cost and not by radius, and capture modelled lane by lane, comparing the door-to-door cost of the proposed alternative with what the shipper pays today.

Scope of work

01

Origin-destination matrix

Existing flows reconstructed by product, origin, destination, mode and seasonality from public databases and field survey.

02

Cost-based catchment area

Effective hinterland delimited by door-to-door total cost instead of geographic distance.

03

Demand projection

Scenarios for production and consumption in the catchment area, with explicit assumptions and ranges in place of point estimates.

04

Capture model

Realistically capturable share estimated lane by lane, comparing the proposed alternative with what the shipper pays today.

05

Sensitivity analysis

How capturable demand responds to variations in tariff, capacity and competitor performance.

Discuss my case

Signals your team will recognise

When three or more of these describe your operation, we usually find enough value to justify a diagnostic.

Discuss demand for your project
  • An investment decision on a terminal, rail spur or port asset.
  • Structuring a project under authorisation, or a PPP proposal.
  • A demand assumption that must survive an investment committee, a lender or a regulator.
  • Assessment of an existing asset’s effective catchment area and growth potential.

What we need from your company

  • Description of the asset, its location and target cargoes
  • Commercial data available within the company
  • A counterpart from business development

Who leads

The founder of LogConsult leads the project from start to finish, takes part in the meetings with the executive team and answers for the result.

How we engage

Fixed fee per deliverable, by scope and geographic coverage

FAQ

Frequently asked questions

What data sources do you use?

Public databases for foreign trade, agricultural and industrial production, port throughput and transport output, complemented by field work with shippers and operators in the region. Every figure delivered carries an identified source.

Is the study suitable for financing?

Yes. The traceability standard (explicit assumption, identified source and documented sensitivity) is built to withstand scrutiny from lenders, investment committees and oversight bodies.

How is this different from a conventional market study?

The difference is capture modelling. A conventional study sizes the market. We also size how much of it the asset can attract and demonstrate, lane by lane, why a shipper would switch.

Next step

Put a number on the recoverable value in your operation

The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.

Talk to a consultant WhatsApp

Reply within one business day · [email protected]