Infrastructure, investment and expansion

EVTEA: technical, economic and environmental feasibility studies

We build demand, engineering and economic appraisal in the same model, with assumptions prepared for banks, investment committees and regulators.

For whom
Governments, agencies, port authorities, investors and operators
Typical timeline
12 to 24 weeks

The decision

Does the project pay for itself, and will the study withstand the lender’s review?

What you receive

  • Technical, economic and environmental feasibility in a single study
  • Project return with the sensitivity of each assumption
  • Risk matrix for the board and the lender

When the executive team calls us

  • A project at the investment decision stage
  • An EVTEA required by a public body or lender
  • A previous study that is out of date or has been challenged

How to start

A 30-minute conversation with a consultant defines the scope and price of the first phase.

Discuss the feasibility of the investment

Context

EVTEA (Estudo de Viabilidade Técnica, Econômica e Ambiental) is the standard Brazilian feasibility study and the document on which the decision to proceed with a transport infrastructure project is taken. Its three dimensions are frequently produced by separate teams with little exchange between them.

Engineering sizes the works, economics builds the cash flow and the environmental team lists the constraints. Each analysis is competent in isolation and makes assumptions about the others. When the three are brought together, the assumptions often fail to reconcile. The study is then redone or, in the worse case, approved with an inconsistency inside it.

We work with the three dimensions coupled from the start. Alignment responds to demand, demand responds to cost, cost responds to environmental constraints, and sensitivity is calculated over the whole. The study is prepared to answer the hard questions of the lender, the approving body and the auditor.

Scope of work

01

Demand study

Origin-destination matrix, cost-based catchment area, scenario projection and lane-by-lane capture modelling.

02

Technical and engineering viability

Alignment and layout alternatives, capacity sizing, capex and opex estimates and physical schedule.

03

Economic and financial viability

Project cash flow, return indicators, cost-benefit analysis and socioeconomic appraisal including non-tariff benefits.

04

Preliminary environmental viability

Constraints, sensitive areas, licensing requirements and their impact on schedule and cost.

05

Risk and sensitivity analysis

Critical variables identified and the range within which the project remains viable, with a risk and mitigation matrix.

Discuss my case

Signals your team will recognise

When three or more of these describe your operation, we usually find enough value to justify a diagnostic.

Discuss the feasibility of the investment
  • A transport infrastructure project at the investment decision stage.
  • An authorisation, concession or PPP process that requires supporting studies.
  • A financing application to a development bank or multilateral institution.
  • A review of an existing EVTEA whose assumptions have aged or do not hold.

What we need from your company

  • Terms of reference, where available
  • Available engineering and market data
  • A project counterpart with decision authority

Who leads

The founder of LogConsult leads the project from start to finish, takes part in the meetings with the executive team and answers for the result.

How we engage

Fixed fee per deliverable, by project size and complexity

FAQ

Frequently asked questions

Does the study meet lender requirements?

It is built for that purpose. We structure it with traceable assumptions, an identified source for each figure and documented sensitivity analysis, which is the standard that development banks and oversight bodies require.

Do you handle environmental licensing?

The environmental dimension of the EVTEA is preliminary. It identifies constraints, sensitive areas and the licensing path, with their effect on schedule and cost. Formal environmental studies are conducted by specialist consultancies and integrated into our project model.

Do you cover all transport modes?

Our specialism is freight: rail, port, inland waterway and intermodal, including terminals and access infrastructure. Passenger transport projects are outside our scope.

Next step

Put a number on the recoverable value in your operation

The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.

Talk to a consultant WhatsApp

Reply within one business day · [email protected]