Infrastructure, investment and expansion

Setting up logistics operations in Brazil

We compare corridors, ports, terminals and states for your cargo and structure the operation, on the tax and the logistics side, before the first contract is signed.

For whom
Trading houses, industrial groups and international operators entering Brazil
Typical timeline
6 to 20 weeks depending on phase

The decision

Where to originate and ship from, and with what structure to start operating in Brazil?

What you receive

  • Corridors and terminals compared for your cargo
  • Tax and logistics structure of the operation
  • Counterparty map and contracting strategy

When the executive team calls us

  • A decision to enter Brazil with your own origination or export flow
  • Choice of port, terminal or state for the first operation
  • Long-term contracts about to be signed

How to start

A 30-minute conversation with a consultant defines the scope and price of the first phase.

Discuss your entry into Brazil

Context

Brazil is a market where the same decision taken six months apart can cost tens of millions. A trading house that chooses the wrong corridor, contracts the wrong terminal or structures the operation in the wrong state carries that error for the full contract term and, in the case of tax structure, for years afterwards.

Most of the information that matters for this decision is unpublished. The capacity available to a new customer at peak differs from nominal terminal capacity. Commercial conditions are negotiated case by case. A port’s effective catchment area, once road haulage cost is added, differs from the one drawn on a map. The interstate tax structure, which rarely appears in entry studies, materially changes the cost to serve of each configuration.

We act as the local technical arm of the team building the operation. We translate the Brazilian market into comparable numbers, test the viable configurations and deliver a recommendation with the arithmetic done. The entry decision is then taken with the quality of information that headquarters would require in any other market.

Scope of work

01

Origination and corridor map

Where the relevant cargo sits, by origin and by crop cycle, and which corridors and ports serve each region, compared on door-to-door total cost.

02

Real capacity diagnosis

What each terminal, railway and port handles at peak, measured on observed performance.

03

Asset contracting strategy

Terminal and storage access alternatives (contract, lease, take equity or build) compared on total cost, risk and lead time.

04

Tax-logistics design

State footprint, invoicing routes, special regimes and applicable incentives, with the fiscal effect built into the cost to serve of each configuration.

05

Origination cost benchmark

The projected cost position against the market reference, so that the operation starts calibrated from the first year.

06

Counterparty map

Who operates what in each corridor, with a technical assessment of the reliability, capacity and track record of potential logistics partners.

Discuss my case

Signals your team will recognise

When three or more of these describe your operation, we usually find enough value to justify a diagnostic.

Discuss your entry into Brazil
  • An international trading house building an origination operation in Brazil.
  • An industrial group structuring inbound or outbound supply chain in the country.
  • A pending decision on which corridor, port or state to anchor the operation in.
  • A need to contract terminal or storage capacity without a local cost and performance reference.
  • An operation already running whose real cost exceeded the entry business case.

What we need from your company

  • Intended products, volumes and destination markets
  • Headquarters’ limits on investment and timing
  • A counterpart with decision authority in Brazil or at headquarters

Who leads

The founder of LogConsult leads the project from start to finish, takes part in the meetings with the executive team and answers for the result.

How we engage

Fixed fee per phase, with scope and deliverables defined by stage

FAQ

Frequently asked questions

Do you work with companies that have no presence in Brazil yet?

Yes. Much of this work is done for teams still at headquarters, before the local entity is incorporated. We work in English, Portuguese and Spanish, and deal with local parties on the client’s behalf when the client prefers.

Does this include incorporation and legal work?

No. Corporate incorporation, licensing and contracts are handled by lawyers. Our scope is the logistics, capacity and tax-logistics decision, and we work together with the client’s legal and tax advisers.

How quickly can we have a recommendation?

A corridor and capacity diagnostic closes in 6 to 8 weeks. The full package, including tax design and asset contracting strategy, takes 14 to 20 weeks.

Do you represent the company in local negotiations?

We join rounds as the technical arm, with the decision and the commercial relationship remaining with the client. Our position on each mandate is defined in writing at the outset.

Next step

Put a number on the recoverable value in your operation

The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.

Talk to a consultant WhatsApp

Reply within one business day · [email protected]