Infrastructure, investment and expansion
Regulatory advisory for logistics and infrastructure
We map the regulatory path and prepare the applications, so that the project schedule is realistic from day one.
The decision
Which grant does the project require, from which body and in how long?
What you receive
- Applicable grant instrument and the bodies involved
- Required studies and the order of the processes
- Regulatory schedule with the points that need attention
When the executive team calls us
- A terminal, spur or transhipment station at the decision stage
- Participation in an auction or public call
- Acquisition of a regulated asset
How to start
A 30-minute conversation with a consultant defines the scope and price of the first phase.
Discuss the regulatory pathContext
A port terminal, a rail spur, a transhipment station and a highway concession have one thing in common. None of them moves forward without an act of the public authority. The procedure changes with the asset and the body, and an application filed with incomplete studies can delay the schedule by many months.
We work on the technical and economic part of that path. We identify the appropriate instrument (authorisation, lease, concession or adhesion contract), prepare the studies each body requires and follow the process at ANTT, ANTAQ, the Ministry of Ports and Airports, the Ministry of Transport and the state agencies.
The work is done with the client’s legal department or with the law firm the client appoints. Our part is engineering, demand, economic modelling and the reading of sector rules. Legal representation remains with the lawyers.
Scope of work
Regulatory map of the project
Applicable grant instrument, bodies involved, studies required, typical duration of each step and the points of the schedule that need attention.
Technical preparation of grant applications
Demand, capacity and feasibility studies and the technical reports required in applications for a private use terminal (TUP), a transhipment station, a railway under authorisation and a port lease.
Support in auctions and public calls
Reading of the tender notice and the draft contract, bid modelling, analysis of obligations and a risk matrix for parties that intend to bid for an asset.
Compliance with contracts and rules
Monitoring of the obligations of a concession, lease or adhesion contract, of the performance indicators and of new rules that affect the operation.
Regulatory due diligence in transactions
Status of the grants, terms and obligations of an asset before a purchase, a sale or a financing.
Discuss my case
Signals your team will recognise
When three or more of these describe your operation, we usually find enough value to justify a diagnostic.
Discuss the regulatory path- A terminal, spur or transhipment station project at the decision stage.
- An intention to take part in a lease or concession auction.
- Entry into Brazil with an asset that depends on a federal or state grant.
- Purchase or financing of an asset whose regulatory status needs to be checked.
What we need from your company
- Project description, location and business model
- Available corporate and technical documents
- Coordination with the company’s legal team
Who leads
The founder of LogConsult leads the project from start to finish, takes part in the meetings with the executive team and answers for the result.
How we engage
Fixed fee per process or monthly monitoring fee
FAQ
Frequently asked questions
Do you replace the law firm?
No. We do the technical and economic part (demand, capacity, feasibility, modelling and the reading of sector rules) and work alongside the client’s lawyers, who are responsible for legal representation.
How long does a private use terminal authorisation take?
The timeline depends on the body, the completeness of the application and environmental licensing, and it varies considerably from case to case. The regulatory map we deliver at the start shows the typical duration of each step and what can run in parallel.
Do you work with foreign companies?
Yes. For groups entering the country, we explain the Brazilian regulatory model, compare the instruments available and conduct the technical part in Portuguese, English and Spanish.
Do you track rule changes?
Yes, under the monthly fee format. The client receives our reading of what changed in the rules for ports, railways, highways and waterways and of the effect on its operation.
Related practices
Market studies and cargo movement potential
We establish how much cargo exists, where it comes from, where it goes and how much of it an asset can realistically capture. Every infrastructure investment decision depends on that answer.
08EVTEA: technical, economic and environmental feasibility studies
We produce the feasibility study that supports the investment decision, with engineering, demand and economic appraisal in one model and assumptions built to withstand a lender’s review.
09Strategic transport planning and PPP structuring
Strategic transport planning and public-private partnership structuring, from the sector master plan to the economic and financial model of the contract.
Next step
Put a number on the recoverable value in your operation
The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.