Infrastructure, investment and expansion

Regulatory advisory for logistics and infrastructure

We map the regulatory path and prepare the applications, so that the project schedule is realistic from day one.

For whom
Shippers, operators, investors and foreign groups with a project or asset subject to transport regulation
Typical timeline
Regulatory map in 3 to 4 weeks; processes follow the procedure of each body

The decision

Which grant does the project require, from which body and in how long?

What you receive

  • Applicable grant instrument and the bodies involved
  • Required studies and the order of the processes
  • Regulatory schedule with the points that need attention

When the executive team calls us

  • A terminal, spur or transhipment station at the decision stage
  • Participation in an auction or public call
  • Acquisition of a regulated asset

How to start

A 30-minute conversation with a consultant defines the scope and price of the first phase.

Discuss the regulatory path

Context

A port terminal, a rail spur, a transhipment station and a highway concession have one thing in common. None of them moves forward without an act of the public authority. The procedure changes with the asset and the body, and an application filed with incomplete studies can delay the schedule by many months.

We work on the technical and economic part of that path. We identify the appropriate instrument (authorisation, lease, concession or adhesion contract), prepare the studies each body requires and follow the process at ANTT, ANTAQ, the Ministry of Ports and Airports, the Ministry of Transport and the state agencies.

The work is done with the client’s legal department or with the law firm the client appoints. Our part is engineering, demand, economic modelling and the reading of sector rules. Legal representation remains with the lawyers.

Scope of work

01

Regulatory map of the project

Applicable grant instrument, bodies involved, studies required, typical duration of each step and the points of the schedule that need attention.

02

Technical preparation of grant applications

Demand, capacity and feasibility studies and the technical reports required in applications for a private use terminal (TUP), a transhipment station, a railway under authorisation and a port lease.

03

Support in auctions and public calls

Reading of the tender notice and the draft contract, bid modelling, analysis of obligations and a risk matrix for parties that intend to bid for an asset.

04

Compliance with contracts and rules

Monitoring of the obligations of a concession, lease or adhesion contract, of the performance indicators and of new rules that affect the operation.

05

Regulatory due diligence in transactions

Status of the grants, terms and obligations of an asset before a purchase, a sale or a financing.

Discuss my case

Signals your team will recognise

When three or more of these describe your operation, we usually find enough value to justify a diagnostic.

Discuss the regulatory path
  • A terminal, spur or transhipment station project at the decision stage.
  • An intention to take part in a lease or concession auction.
  • Entry into Brazil with an asset that depends on a federal or state grant.
  • Purchase or financing of an asset whose regulatory status needs to be checked.

What we need from your company

  • Project description, location and business model
  • Available corporate and technical documents
  • Coordination with the company’s legal team

Who leads

The founder of LogConsult leads the project from start to finish, takes part in the meetings with the executive team and answers for the result.

How we engage

Fixed fee per process or monthly monitoring fee

FAQ

Frequently asked questions

Do you replace the law firm?

No. We do the technical and economic part (demand, capacity, feasibility, modelling and the reading of sector rules) and work alongside the client’s lawyers, who are responsible for legal representation.

How long does a private use terminal authorisation take?

The timeline depends on the body, the completeness of the application and environmental licensing, and it varies considerably from case to case. The regulatory map we deliver at the start shows the typical duration of each step and what can run in parallel.

Do you work with foreign companies?

Yes. For groups entering the country, we explain the Brazilian regulatory model, compare the instruments available and conduct the technical part in Portuguese, English and Spanish.

Do you track rule changes?

Yes, under the monthly fee format. The client receives our reading of what changed in the rules for ports, railways, highways and waterways and of the effect on its operation.

Next step

Put a number on the recoverable value in your operation

The first step is a 30-minute conversation about your corridor, your contracts and the order of magnitude involved. There is no pitch deck and no commitment.

Talk to a consultant WhatsApp

Reply within one business day · [email protected]